Latest Case Studies
New 24' x 10' portable building altered and delivered in 5 working days
21/09/2026
We received an enquiry through our website from Ribble Valley Diesels wanting a new 20’ x 10’ portable cabin with an
An ambitious delivery date required
9/09/2026
We received a telephone call from Barry Forshore, the MD of LFJ Engineering who originally enquired about a 12’ x 10’
New 20' x 10' with a timber clad front supplied
6/09/2026
Today we supplied the Window Doctor in Coventry with a new 20’ x 10’ open plan portable building which was clad on the
New welfare portable building for Branston Ltd
6/09/2026
This is the 3rd building we have recently supplied to Branston Ltd, the potato suppliers near Lincoln, but this time it
The second warehouse installation in one week
28/08/2026
Today we supplied Boston Energy, who provide wind turbine specialist services through the lifecycle, from foundation,
And once again, another installation within a factory building
24/08/2026
We are becoming very adept at installing our new portable buildings into tight spaces within a factory building and are
Another super quick delivery
18/08/2026
We were contacted through our website by Drywhite Ltd on Monday the 10th August as they needed a new 16’ x 10’ portable
A different requirement for Origin Amenity Solutions
8/08/2026
Origin Amenity Solutions is one of the largest UK providers of grass turf and plant health solutions, from growth and